Fire Extinguisher Production Line

Fire Extinguisher Production Line


Project Description

The production machine is designed used to fill the dry powder in the flame douser chamber. The machine is intended to load up with cross filling in 2 stations. The filling machine comprises a dry powder barrel, return the dry powder pail, a channel, a vacuum siphon, and a willing host for 2 stations. The machine can top off around 320 flame quenchers in one hour. Filling strategy has two capacities: brisk filling and filling. When filling, the jug mouth is fixed by the nylon with a slope of 60 degrees. The fixing impact of the container mouth is excellent, and the jug body with poor oppositeness can be fixed, and the filling segment is precise.

Specification:

  • Output: about 2400 pieces /8h.
  • Scope of application: 1KG – 12KG filling.
  • Machine size: 1500*800*1500mm.
Free Consultation

Free Consultation